Auspicious symbol area

Quxing Town, Xiangfu District, Kaifeng City, comprehensive utilization of national land space + rural revitalization and high-standard farmland construction (Phase I) project third section bid evaluation publicity

Release time: 2024-06-24 15:09:38 Number of page views: Author: Kaifeng Public resources trading information Network

Comprehensive utilization of land space in Quxing Town, Xiangfu District, Kaifeng City+Rural revitalization and high-standard farmland construction (Phase I) project third section bid evaluation publicity

Henan Hongshenghuo whole process Project Management Co., Ltd. was commissioned by Kaifeng Xinnong Zhengmao Ecological Agriculture Development Co., LTD., on the comprehensive utilization of land space in Quxing Town, Xiangfu District, Kaifeng City+The rural revitalization and high-standard farmland construction (Phase I) project is open to tender2024621Bid opening and evaluation activities were carried out in accordance with the law in the Public Resources Trading Center of Xiangfu District, Kaifeng City。The bid evaluation committee conducted the evaluation in accordance with the provisions of the bidding documents, and confirmed by the tenderer, the bid evaluation results are now publicized as follows:

1. Description of the bidding project

1.1Project name: Comprehensive utilization of land space in Quxing Town, Xiangfu District, Kaifeng City+Rural revitalization and high-standard farmland construction (Phase I) project

1.2Project Number:HSH-GSGK-2024-0430

1.3Construction site: Xiangfu District, Kaifeng City

1.4Project Overview and construction content: This project mainly includes Quxing Town high-standard farmland construction project, the comprehensive utilization of national land space project, agricultural science and innovation service center (village-level agricultural service center) and other projects。Among them, the bidding project and construction content is Quxing Town2023High standard farmland demonstration transformation and upgrading projects:

(1) High-standard farmland construction projects

Project to be constructed10000Acres of high-standard farmland。The main construction contents include:

(1)Land transfer: transfer or land trusteeship and other operational services for part of the land involved in the project。

(2)Soil productivity improvement project: including soil layer stripping and backfilling, embankment construction, earthwork backfilling, ploughing and finishing, soil management, soil deep loosening and soil fertility cultivation (bio-organic fertilizer);

(3)Irrigation and drainage projects: including irrigation stations, ponds (DAMS), agricultural Wells, pumping stations, dredging ditches, canal system buildings, efficient water-saving irrigation projects, etc.

(4)Field road engineering: including machine road and production road engineering;

(5)Farmland protection projects: including shelterbelts, bank slope protection;

(6)Farmland power transmission and distribution project: including distribution room, low voltage line;

(7)Smart agricultural information engineering: including comprehensive management center,5GBase station, information equipment, field positioning monitoring site construction, etc.;

(8)Other works。

1.5Source of funds and Investment: Enterprise self-financing, approx25080万元。Among them: The bidding amount: approx3300万元。

1.6Construction period requirements: the first section:Design period: from the date of signing the contract30The preliminary design of the works shall be completed within calendar days;The completion time of construction drawing design and budget preparation shall be determined by the owner through consultation with the winning bidder according to the project progress。Construction period: six months from the date of signing the contract (press180Calendar days);

Section 2: From the date when the contract is signed and takes effect to the date when the project is completed, acceptance, settlement and other matters are completed;

Section 3: same construction period (including defect liability period))

1.7Bidding scope: The first part of the bid: the whole process management of the project survey, design (construction drawing design, etc.), construction, material procurement, completion acceptance, handover, completion filing, defect repair and warranty services within the project defect liability period and all the contents specified in the bidding documents。Includes but is not limited to the following:1.Engineering survey, construction drawing design, follow-up construction cooperation, etc.;2.Project construction and procurement (including all construction contents and materials, equipment, facilities within the scope of the construction drawings of the project procurement, installation, commissioning) and other related content, and in accordance with the standards and regulations to complete the completion of acceptance, trial operation, project handover and completion of the record, defect repair within the responsibility period of engineering defects, warranty services;3.Other contents that should be included in the scope of the general contract of the project;

Section 2: Provide engineering consulting services including preliminary consultation, cost, project management (including project approval and construction application), project post-evaluation and other related aspects of the construction project's preliminary research and decision-making and the whole life cycle of project implementation;

The third bidding section: the whole process supervision service in the construction stage。

1.8Quality requirements: The first section quality requirements:

1Design quality standards: meet the current national and local survey and design standards, and ensure the final approval (if the standards are inconsistent, the higher one shall prevail);

2Construction quality standards: in line with the national, industry and local relevant construction acceptance standards, acceptance;

Quality requirements of the second bidding section: comply with the relevant national, industrial and local laws and regulations, norms and technical standards, and meet the service requirements of the tenderer;

Quality requirements of the third bidding section: meet the requirements of current national norms and technical standards。

Ii. Division of bid sections

2.1The project is divided into three sections:

Section 1:EPC(设计+Construction) general contract;

Section 2: Project management consulting services;

Section 3: Project supervision service。

2.2Bidding control price: one bid section: design fee maximum price (rate quote) : completion audit final price2.0%

The maximum price of construction and installation fee (rate quote) : the final price of completion audit100%

Section II: the final settlement price of the actual investment of the project3.5%

Section three: construction and installation costs of the project1.5%

Iii. Number of bid Evaluation Committee members:5人。     

Iv. Bid evaluation

4.1Bidders who pass the bid evaluation stage after evaluation by the bid evaluation committee (in no particular order)

Three bidding sections:

Bid the full name of the candidate

Tender offer(%)

Project director

Quality requirement

工期

Hongxiang construction engineering management Co., LTD

1.45

Liu Shengli

Meet the requirements of current national norms and technical standards

The same construction period (including defect liability period))

Zhongjian Shanhe Construction Management Group Co., LTD

1.45

张旭

Meet the requirements of current national norms and technical standards

The same construction period (including defect liability period))

Sino Water Engineering Management Co., LTD

1.49

Wei Huanlei

Meet the requirements of current national norms and technical standards

The same construction period (including defect liability period))

Zhongke Huayu Engineering Consulting Co., LTD

1.46

Ma Yanmin

Meet the requirements of current national norms and technical standards

The same construction period (including defect liability period))

4.2Project management personnel of the successful candidate

Section 3

Full name of the successful candidate

Personnel category

姓名

Practice qualification certificate or title certificate name

Certificate number

Hongxiang construction engineering management Co., LTD

Project director

Liu Shengli

Registration certificate of supervision engineer

2210007540

Zhongjian Shanhe Construction Management Group Co., LTD

Project director

张旭

Registration certificate of supervision engineer

2210019502

Sino Water Engineering Management Co., LTD

Project director

Wei Huanlei

Registration certificate of supervision engineer

221003704

Zhongke Huayu Engineering Consulting Co., LTD

Project director

Ma Yanmin

Registration certificate of supervision engineer

2210011372

4.3Successful candidate performance

/

4.4The qualifications and ability of the successful candidate to respond to the requirements of the bidding documents

 4.4.1Qualifications required by the bidding documents

Qualifications and abilities

3.1The bidder has independent legal personality and valid business license;

3.2The bidder shall have the engineering supervision comprehensive qualification or municipal public engineering supervision Grade B (including) or above qualification, water conservancy engineering construction supervision grade B (including) or above qualification;

3.3Personnel requirements: The proposed chief supervision engineer shall have a registered supervision engineer (water conservancy professional) qualification certificate, and have a senior technical title or above;And does not serve as the project chief supervision engineer of other construction projects under construction (bidder's own commitment), provided by202361Social security certification materials paid by the enterprise for any consecutive three months since the beginning of the day;

3.4Financial requirements: Provided2022Annual OR2023The annual financial report audited by an accounting firm, the newly established company less than one year to provide its basic bank credit certificate issued in the past three months;

3.5Reputation requirements: Bidders listed in the record list of untrustworthy persons subject to enforcement, major tax law and untrustworthy subjects, and serious illegal and untrustworthy behaviors of government procurement shall refuse to participate in the bidding of this project;【 Inquiry channel: China Executive Information Disclosure Network (http://zxgk.court.gov.cn/shixin/) inquire about persons subject to enforcement for dishonesty;"Credit China" website (www.creditchina.gov.cn) Inquire about major tax violations and dishonest subjects;China Government Procurement Website (www.ccgp.gov.cnQuery the list of records of serious illegal and dishonest acts of government procurement 】 (The query date is after the announcement date, if the consortium is formed to bid, all members of the consortium need to provide)。

3.6The person in charge of the unit is the same person or different units that have a holding and management relationship may not participate in the same bid at the same time;[Provide the letter of commitment, and provide the relevant materials queried in the "National Enterprise Credit Information Publicity System" (including the company's basic information, shareholder information and equity change information);]

3.7Joint bid is not accepted in the third section of the project。

 4.4.2The qualifications and ability of the successful candidate to respond to the requirements of the bidding documents

Three bidding sections:

Full name of the successful candidate

Response condition

Hongxiang construction engineering management Co., LTD

responded

Zhongjian Shanhe Construction Management Group Co., LTD

responded

Sino Water Engineering Management Co., LTD

responded

Zhongke Huayu Engineering Consulting Co., LTD

responded

4.5Circumstances and reasons for rejection of bid: None

5. Other contents of publicity stipulated in the bidding documents

      无。

6. Publicity time

2024625日至2024627日。

Channels and methods for raising objections

According to the BianPublic Administration Office (202013The document stipulates that if the bidder has objections to the above results, it can raise objections to the tenderer on the public resources trading information network cable in Kaifeng City during the publicity period, and the overdue will no longer be accepted, and the tenderer should be from the date of receipt of the objection3Reply within days,If the objector still has objections to the reply or the tenderer fails to make a reply within the prescribed time, the objector may do so on the date of publicity10Within days (objection reply period does not count) in the Kaifeng public resources trading information network online complaint。(In the important document column of the Kaifeng public resources trading information website, there are text formats and requirements for objections and complaints of construction projects)。

8. Contact information

Tenderer: Kaifeng Xinnong Zhengmao Ecological Agriculture Development Co., LTD

    Address: Quxing Town People's Government, Xiangfu District, Kaifeng City, Henan Province

Contact: Ms. Tian

Contact information:18639879050

Bidding agency: Henan Hongshenghuo whole process Project Management Co., LTD

Address: Jingyi Road, Xiangfu District, Kaifeng City

Contact: Ms. Xiang

Contact information:0371-26625885

Contact information of administrative supervision department

Supervision unit: Kaifeng Xiangfu District construction project bidding Management Office

    话:0371-26668106

9. Publishing media

This announcement was published simultaneously on the "China Tendering and Bidding Public Service Platform", "Henan Electronic Tendering and Bidding Public Service Platform" and "Kaifeng Public Resources Trading Information Network"。

 


All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD